© Yan & Partners, 2026
EnTc
Underwater & marine

Discovery Bay shipyard slipway repair

Underwater repair of worn lifting-platform rails and a seabed depth survey for desilting at the Discovery Bay shipyard.

Year
2007
Client
Discovery Bay Enterprises Ltd
Location
Discovery Bay, Lantau Island
Status
Completed
Category
Underwater & marine

The shipyard's lifting platform runs on steel rails that continue below the waterline, down to about −4.8 m, and sections of the rails had worn.

Our repair: cut out the worn sections, fully weld in 20 mm steel plate, and add 10 mm stiffener plates every 800–1,000 mm, all done underwater.

We also surveyed seabed levels across the slipway on a grid to define how much silt needed to be removed.

Drawings

Rail repair method · 路軌修補方案
Rail repair method · 路軌修補方案
Rail repair, section A–A · 修補剖面
Rail repair, section A–A · 修補剖面
Rail repair, sections A–A and B–B · 修補剖面
Rail repair, sections A–A and B–B · 修補剖面
Seabed levels, plan · 海床清淤深度平面
Seabed levels, plan · 海床清淤深度平面
Seabed levels, sections · 海床清淤深度立面
Seabed levels, sections · 海床清淤深度立面