© Yan & Partners, 2026
EnTc
Home / Projects

Projects

Completed works, ongoing projects and concepts, from 1999 to today.

2005 · Underwater & marine

Stanley Pier reconstruction

Underwater welding, pile works and floating steel formwork for rebuilding a pier in open water, planned over 190 working days.

2018 – 2019 · Underwater & marine

Avenue of Stars: removing old marine piles

Underwater cutting and removal of the old marine piles beneath the Avenue of Stars for its expansion.

2012 – · Drainage & MDP

Multipurpose Drain Pipe (MDP)

Our patented drainage and filtration pipe that resists clogging. Silver Award, HKMA/HKT Global Innovation Award 2024/25.

2010 · 2016 · Underwater & marine

Wan Chai Reclamation Phase 1 & 3

Seawall blocks and caissons for Section C2 (2010), and temporary water diversion pipes for Section C3 (2016).

2018 · Underwater & marine

Causeway Bay seawater pump house intake

Underwater inspection and construction at the seawater intake of a building's cooling-water pump house.

2022 · Underwater & marine

Island Eastern Corridor pile cap repair

Working platforms and access cages for repairing defective pile caps under the Island Eastern Corridor.

2020 – 2021 · Hydraulic

Box culvert desilting, Hoi Fai Road to Olympian City

Diver-operated desilting of a flooded box culvert, with on-site settling and dewatering so only dry spoil leaves the site.

2009 · Underwater & marine

Tong Fuk sea earth cables, Lantau

Laying and burying sea earth cables for the Tong Fuk international telecommunications station.

Underwater & marine

Quarry Bay sunken vessel: survey and salvage

Underwater survey of a sunken barge, then cutting it into three sections of 91, 119 and 180 tonnes to lift it out.

2007 · Underwater & marine

Discovery Bay shipyard slipway repair

Underwater repair of worn lifting-platform rails and a seabed depth survey for desilting at the Discovery Bay shipyard.

2021 · Hydraulic

Leighton Road Ø2100 shaft water-stop seal

A bolted steel seal plate to close off a 2.1 m diameter drainage shaft so works downstream could proceed in the dry.

Temporary works

Tseung Kwan O – Lam Tin Tunnel: concreting formwork platforms

Suspended formwork platforms for placing concrete around marine piles on the tunnel project.

2012 – · Temporary works

Temporary works design

Access towers, floating rafts and platforms we design so crews can work safely over and in water.

Research

Improved underwater welding handle

Our handle design is now the standard across Hong Kong's commercial diving industry.

2024 · Drainage & MDP

EcoVeil thin-layer green roofs

Thin-layer green roofs drained by MDP, collecting rainwater for reuse.