
Tseung Kwan O – Lam Tin Tunnel: concreting formwork platforms
Suspended formwork platforms for placing concrete around marine piles on the tunnel project.
- Location
- Tseung Kwan O, New Territories
- Status
- Completed
- Category
- Temporary works
On the Tseung Kwan O – Lam Tin Tunnel works, concrete had to be placed around marine piles above the water. We designed a set of formwork platforms that hang from the piles on steel beams. Each platform carries its own working deck, hinged curved formwork panels and edge protection, and can be lowered into position, opened, struck and moved to the next pile.
Drawings

