Wan Chai Reclamation Phase 1 & 3
Seawall blocks and caissons for Section C2 (2010), and temporary water diversion pipes for Section C3 (2016).
- Year
- 2010 · 2016
- Client
- Civil Engineering and Development Department (CEDD)
- Location
- Wan Chai, Hong Kong Island
- Status
- Completed
- Category
- Underwater & marine
In 2010 we installed seawall blocks and caissons for Section C2 of the Wan Chai Central Harbourfront Development.
In 2016 we returned for Section C3 to install temporary water diversion pipes through the box culvert bays, with steel bulkheads at Bays 7 and 8, and to remove them again when they were no longer needed.
Client for both stages: Civil Engineering and Development Department (CEDD).
Site photos



Drawings